Electro-instrumental and automation engineering design

COMPANY
Designing and construction of hydroelectric plants
Settore
Hydroelectric turbines
Data progetto
2014
Albania
Background Image

What we have done

Electro-instrumental and automation engineering design of 3 hydroelectric plants.

  • COMPANY
    Hydro Energia S.r.l. designs and constructs hydroelectric plants.
  • REQUIREMENT
    Electro-instrumental and automation engineering design necessary for the procurement of services and materials for the 3 hydroelectric plants located in Albania as follows:

    - Lena (Four 6.900 kVA turbines)
    - Stravaj (Two 4.400 kVA turbines)
    - Treska 4 (Two 4.800 kVA turbines)
  • SOLUTION
    Our team produced basic, detailed and construction engineering plans providing the Client with the correct documentation to ensure the proper implementation of the electro-instrumental construction and subsequent inspections.

    The design includes:

    - Specifications for electro-instrumental services procurement
    - Technical specifications for the purchase of LV and MV switchboards
    - Wires and cables lay-out design
    - Sizing of electrical components
    - Interconnect diagrams
    - Engineering for the control framework
    - Programming of the control system (PLC)
    - Field commissioning of the control system